qizhen0926
Guest
|
|
Precautions need to install shower
« on: Dec 7th, 2015, 10:10pm » |
Quote Modify
Remove
|
Recently, there's a shower room burst event, caused a lot of people's attention. However, according to professionals it belongs to a small probability event,pittsburgh ultra advanced stain do not have universality. Today, Xiao Bian gave you a list of what to install shower precautions. 1, embedded hole shower room dimensions should not renovated bathroom in front on the first designed, wiring leakage protection switch devices should be installed in the shower room before considered good, in order to avoid rework; 2, shower packaging Please be opened after the vertical wall smooth glass placed horizontally or uneven place could lead to glass breakage, causing property damage or personal injury; 3, carrying, handling the horizontal shower easily broken glass, must be moving vertically and simultaneously by two or more; 4, cigarettes and other burning flame will destroy the spray or glass, be sure to stay away from fire sources, avoid benzene, paint,can composite decking be put on cement stoop paint cleaners strong organic solvent exposure and, if accidental exposure may cause surface softening and dissolving compromise product quality phenomenon; 5, acrylic products when heated to 100 �� begins to soften, so avoid using or storing at 80 �� or more high-temperature environment; 6. Do not use scouring powder wipe, scouring powder will corrode the surface, reducing the surface smoothness; 7, use water or mild detergent to clean the product surface, that can not be removed stains, use a small amount of alcohol impregnated with a clean cloth to remove stains; 8, anti-seepage treatment wall: real estate company through rough housing wall is not waterproof, and should advance before scraping stick tile cement impermeable layer then paste tiles, tile stickers After renovation request The gaps tile joints workers were treated, it can avoid the toilet water to infiltrate through the cracks between the blocks facades, from the bitter pains. 9, drain and floor drain treatment: the bathroom due to the odor and infectious disease prevention,outdoor handrail material panel state regulations when building the pool should have a concave curved gooseneck tube design, bathroom floor drain has been placed level, but one but the water through the ground or water pipe water seepage, the entire pool will be filled with dirty water toilet recess and pervasive water or climb a wall into the room through or penetrate the lower corner.
|