qizhen0926
Guest
|
|
Reason parquet produce chipping phenomenon
« on: Jan 11th, 2016, 10:46pm » |
Quote Modify
Remove
|
Multilayer parquet flooring and paint lock (MDF as a substrate) side of the collapse of the complaint is also increasing, according to the situation analysis of complaints, mainly the following factors: 1, production factors After multi-layer parquet flooring and paint lock (MDF as base material) was finished tenon, in roller coating or curtain coating process, the paint spill to the floor of the tongue and groove at the actual width of the film is larger than wood alternative fencing, generate risks for the floor chipping paint spills more opportunities chipping the floor will be. For mortising after the first painting of the production process, paint spillover phenomenon is inevitable, according to the appropriate product standards although they can not determine the quality problems, we must pay close attention and take measures to minimize the thickness of each painting, in particular, curtain coating is more important to minimize the extent of the paint spill. 2, the installation factor Due to tight tongue and groove flooring or floor some slight bending of the case, the installation of larger drag flooring, flooring installation when the striking force is too large and uneven, resulting in local film jagged edge off. It features can be found after the installation, no law random distribution, a small number occurred. Measures to the floor with a head when the module is mounted on the alternative to wood decking, then gently tapping with a rubber hammer module, so that the floor abutting each other, knocking process forced to be uniform. In addition, the use of playing keel installed wood flooring, someone hit the nail on the tongue tongue, there is no foolproof because the nail sunk in the tongue, when installed under a floor, nailing the tongue appear at the surface of the plate convex and small, serious chipping phenomenon occurs at the edge of small packets. Its characteristics are chipping can be found after installation, a regular distribution, a small number occurred. Take measures to install the floor, nailing in tongue and groove side. 3, the ground is not flat Because the ground is not flat, after the floor coverings, a gap between the floor and the ground in some places, people walk around the course, moving up and down the floor, the side of the floor caused by friction between the chipping. It features floor coverings finished, chipping occurs in people often walk around the area, and local. Take measures to be sure before floor coverings measuring flatness ground, its flatness should be less than 3mm / 2000mm, does not have the conditions on the ground, should go first and then be flat pavement. 4, when the surrounding floor coverings slot reserved inadequate Article Source: alternative decking tiles
|