Metropolis Reality Forums Wood flooring construction process

   Metropolis Reality Forums
   Amazing Race
   Fantasy Amazing Race Games
(Moderators: JP, Heather, Isle_be_back)
   Wood flooring construction process
Previous topic | New Topic | Next topic »
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print
   Author  Topic: Wood flooring construction process  (Read 168 times)
qizhen0926
Guest

Email

Wood flooring construction process
« on: Feb 23rd, 2016, 8:20pm »
Quote Quote Modify Modify Remove Remove

Wood flooring approach:
1. Bonded wood:
On the concrete structure with a 15 mm thick layer of 1: 3 cement mortar, and now they use vain polymer binder, directly attached to the wooden floor on the ground.
2. The solid wood floor shop formula:
Solid wood floor shop style wooden joists grassroots trapezoidal cross-section (commonly known as wood flute), wooden joists spacing is generally 400 mm, can fill a number of intermediate lightweight materials to reduce the empty drum person when walking, and to improve the insulation spacer thermal effects. To enhance the integrity of the wood joists capped nail subfloor, subfloor finally struck demoted or bonding wood floors.
In a wood floor wall junction, use the skirting board gland. Disseminated moisture, ventilation openings may be skirting board.
3. Overhead wooden floor:
Overhead is on the ground floor wooden puzzle first ridge wall, then install wooden joists, subfloor, the floor surface. Due to low height family room, this Overhead flooring is rarely used in home decoration.
Process:
Construction technology 1. Paste law:
Brushing the end of plastic grass-roots clean-up elastic line, leveling drilling, installation of embedded parts subfloor installation, leveling, planing nailing floor, leveling, planing planed nail baseboards, paint polished on wax.
2. Strengthen the construction process flooring:
Cleanup grassroots laying plastic film composite floor mats Paste install baseboards.
3. The method of laying solid construction process:
Grassroots cleanup elastic line Installation of embedded parts drilling ground moisture, water treatment install wooden keel pad insulation elastic line, Binding subfloor leveling, planing nailed wooden floor, leveling, planing device skirting board planed, polished paint wax
Construction Points:
1. The first installation solid flooring keel, and then the wood floor coverings.
2. keel installation methods: on the ground should be doing embedded parts to fix the wooden keel, bolts and lead wire embedded parts, embedded parts spacing of 800 mm from the ground down into the borehole.
3. The wood floor installation methods: laying solid wood flooring should base panel, the base panel Daixinban use.
4. After completion of floor coverings, the first with a plane surface planing planed, the floor swept clean after brushing the floor surface paint, polishing wax process.
5. All wood transported to the construction site after installation, unpacking should be stored indoors more than a week, so that the wood floor and the room temperature, relative humidity can be used after adaptation.
6. The selection should be carried out before the wood floor installation, excluding obvious quality defects of non-conforming product. The consistent color pattern shop in the same room, there was a slight defect but does not affect the quality of use, use can be placed at the bottom of the bed, cabinets and other furniture, must be the same thickness in the same room. Actual pavement area should increase the purchase of 10% of the complete loss of a purchase.
7. Paving wood floor keel should use the back trees, wood keel, skirting boards easily deformed pine, fir, etc. should be embalmed.
8. Paving solid wood flooring should be avoided in heavy rain, rain and other weather conditions construction. Construction is best to keep the indoor temperature and humidity stable.
9. The same room wooden floor coverings should once finished, so to have sufficient materials, and to protect the finished product in a timely manner to prevent contamination of surface oil collapse, fruit juice. When installed in a timely manner to wipe out the glue.
Precautions:
1. wood-adhesive cement floor tiling to ensure that sand can not afford, not empty crack, grass-roots must be clean.
2. Primary uneven application of cement mortar before tiling wood floors. The moisture content of not more than 15%.
3. Paste wood flooring adhesive to thin and uniform. Two adjacent wood floor height of not more than 1 mm.
all link:
balcony outdoor decking
outdoor deck stair designs
build deck under pool coping
IP Logged
Back to top
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print

Previous topic | New Topic | Next topic »

Metropolis Reality Forums » Powered by YaBB 1 Gold - SP 1.3.1!
YaBB 2000-2003. All Rights Reserved.