Yet Another Bulletin Board
Sponsored by: The Fans!


Welcome, Guest. Please Login or Register.
Jan 2nd, 2025, 9:17pm

Upcoming Premiere Dates:
Survivor 23, Season premiere
Thursday, September 14 (8:00-9:30 PM, ET/PT) on CBS




Home Home Help Help Search Search Members Members Chat Chat Member Map Member Map Login Login Register Register

| Fantasy Survivor Game | Music Forums | The '80s Server Forums | Shop Online |



Metropolis Reality Forums « floor paving after the fall and winter vulnerable »

   Metropolis Reality Forums
   Amazing Race
   Fantasy Amazing Race Games
(Moderators: JP, Heather, Isle_be_back)
   floor paving after the fall and winter vulnerable
Previous topic | New Topic | Next topic »
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print
   Author  Topic: floor paving after the fall and winter vulnerable  (Read 160 times)
qizhen0926
Guest

Email

floor paving after the fall and winter vulnerable
« on: Jun 27th, 2016, 2:24am »
Quote Quote Modify Modify Remove Remove

Spring and autumn more appropriate temperature and humidity, high summer temperatures,how to paint composite cabinets  floor paving after the fall and winter vulnerable to physical factors as a result of thermal expansion and contraction deformation cracking; low winter temperatures, the floor is dry, the spring and summer can cause swelling due to moisture absorption drum onwards.
 
 In addition to seasonal factors, floor paving temperature should be maintained between 16 �� to 30 ��, this temperature allows the wood to maintain its natural state, the construction time is best to avoid noon and night, as much as possible, after two in the afternoon, this time temperature humidity is the most appropriate day. 2,wpc decking offers messenia  decoration reasonable step, paving the floor is usually after the walls, woodwork, oil workers and other process completion, the other works on the floor to avoid damage during the construction.  
   
  Before laying the ground floor in order to make the clean-up, clean out the cement ground, putty, ensure that the ground level, to ensure that the ground sand particles do not measure after residual moisture, you can start laying the floor. 3, waterproof moisture-proof measures to the measures to be done before the flooring must be done close to the kitchen and bathroom space should pay more attention. Waterproof material to be coated uniformly,boat floor plywood  if there is a gap, then use cement fill. Close to the water to brush on 30cm high waterproof material.  
   
  In addition to the waterproof material, it can also be covered with a layer of waterproof paper in the bottom floor, close to the wall also set aside baseboard position. 4, floor tiling to painting,waterproof wicker fencing panels  but also to the floor after floor laid on a layer of floor paint brush, polishing wax from time to time. Since the floor is often worn paint brush floor waxing and polishing floors help to protect and prolong the life of the floor, clean up is also more convenient.
IP Logged
Back to top
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print

Previous topic | New Topic | Next topic »

Metropolis Reality Forums » Powered by YaBB 1 Gold - SP 1.3.1!
YaBB © 2000-2003. All Rights Reserved.