Yet Another Bulletin Board
Sponsored by: The Fans!


Welcome, Guest. Please Login or Register.
Dec 25th, 2024, 1:48am

Upcoming Premiere Dates:
Survivor 23, Season premiere
Thursday, September 14 (8:00-9:30 PM, ET/PT) on CBS




Home Home Help Help Search Search Members Members Chat Chat Member Map Member Map Login Login Register Register

| Fantasy Survivor Game | Music Forums | The '80s Server Forums | Shop Online |



Metropolis Reality Forums « The slag double-stage crusher is recorded »

   Metropolis Reality Forums
   Amazing Race
   Fantasy Amazing Race Games
(Moderators: JP, Heather, Isle_be_back)
   The slag double-stage crusher is recorded
Previous topic | New Topic | Next topic »
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print
   Author  Topic: The slag double-stage crusher is recorded  (Read 164 times)
qizhen0926
Guest

Email

The slag double-stage crusher is recorded
« on: Dec 14th, 2017, 11:02pm »
Quote Quote Modify Modify Remove Remove

Slag two-stage crusher is one of severe crushing equipment, so we must pay attention to safety in the process of use, according to use standard operation, switch machine order never made a mistake. The safety production of slag double-stage crusher is as follows:atmosphere electri furnace for lab
1.Before starting the two-stage pulverizer, check the lubrication system to see if it needs to be relubricated, wear and tear, and check whether new accessories need to be replaced. Adjust the tension of the belt to see that there is no need to replace, and all the bolts are carefully checked to be fixed. Ensure no residue in the cavity.
 
2.Start the two-stage grinder oil pump motor for 5-10 minutes, check the working conditions of the lubrication system, and start the main motor after normal operation.muffle furnace heating elements  
 
 
3.The two-stage pulverizer must be idle for 20 minutes, ensuring that no abnormal conditions are followed before starting the feed. During the period, the feeding speed must be constant, the feed amount must be average, and not too long, so that the equipment is in a state of overload and the wear rate of the two-stage grinder is accelerated. Thus the service life of the equipment is reduced.
 
4.To complete the work, before the normal shutdown, must stop the feed first, after the slag double-stage crusher pulverizing the material in the cavity, then shut off the equipment, and finally cut off the total power supply.
In addition, the two-stage crusher in the process of work, need to have special staff to check at any time, any anomalies found someone to stop immediately, then used for troubleshooting.High ine gas vacuum ucible furnace With Bottom
 
 
IP Logged
Back to top
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print

Previous topic | New Topic | Next topic »

Metropolis Reality Forums » Powered by YaBB 1 Gold - SP 1.3.1!
YaBB © 2000-2003. All Rights Reserved.