Yet Another Bulletin Board
Sponsored by: The Fans!


Welcome, Guest. Please Login or Register.
Dec 24th, 2024, 12:34am

Upcoming Premiere Dates:
Survivor 23, Season premiere
Thursday, September 14 (8:00-9:30 PM, ET/PT) on CBS




Home Home Help Help Search Search Members Members Chat Chat Member Map Member Map Login Login Register Register

| Fantasy Survivor Game | Music Forums | The '80s Server Forums | Shop Online |



Metropolis Reality Forums « Gas furnace ignition »

   Metropolis Reality Forums
   Amazing Race
   Fantasy Amazing Race Games
(Moderators: JP, Heather, Isle_be_back)
   Gas furnace ignition
Previous topic | New Topic | Next topic »
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print
   Author  Topic: Gas furnace ignition  (Read 167 times)
qizhen0926
Guest

Email

Gas furnace ignition
« on: Jan 26th, 2018, 1:43am »
Quote Quote Modify Modify Remove Remove

Furnace slag fill is an important preparatory work before opening, to fill foundation in building houses like slag, if the foundation did not play well after the housing will tilt, if no slag fill is likely to cause a partial phenomenon appeared in furnace. Fill hanging ash slag should be large, some factory more attention to this aspect, will be screened to remove fine slag slag and slag slag in small particles should be filled, only to Yu 25 mm clinker in the furnace, but mostly to the size of mixed slag fill in the furnace,Gold and silver platinum precious metals melting electrical induction furnace and the slag accounted for most of the slag should not fill in the furnace.  
Small Lab Vacuum Furnace Sold
To fill in the clinker there for the following requirements: one is the low water requirements (filling in between the skirt and the base of the furnace slag can be high moisture slag slag is two), low carbon content (e.g. less than 20%), if the carbon content is too high, when after the ignition, this part will continue to affect the combustion grate. The ventilation gap between the grate should be cleaned before the slag filling, and the slag should not be filled to the ventilation gap when the slag is filled. Slag fill to the grate (CAP) on the slag deposition is 200 mm, is conducive to the formation of Steamed Buns and ventilation, but some units fill slag for the opposite, 1# grate is slag is basin shaped and low in the middle, edge high, and this may be related to the structure of the ash system (ash faster this case is often used in the form of slag fill edge).Gear Gas Quenching Vacuum Furnace
IP Logged
Back to top
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print

Previous topic | New Topic | Next topic »

Metropolis Reality Forums » Powered by YaBB 1 Gold - SP 1.3.1!
YaBB © 2000-2003. All Rights Reserved.