Yet Another Bulletin Board
Sponsored by: The Fans!


Welcome, Guest. Please Login or Register.
Dec 23rd, 2024, 2:05pm

Upcoming Premiere Dates:
Survivor 23, Season premiere
Thursday, September 14 (8:00-9:30 PM, ET/PT) on CBS




Home Home Help Help Search Search Members Members Chat Chat Member Map Member Map Login Login Register Register

| Fantasy Survivor Game | Music Forums | The '80s Server Forums | Shop Online |



Metropolis Reality Forums « Smelting and charging of electric furnace »

   Metropolis Reality Forums
   Amazing Race
   Fantasy Amazing Race Games
(Moderators: JP, Heather, Isle_be_back)
   Smelting and charging of electric furnace
Previous topic | New Topic | Next topic »
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print
   Author  Topic: Smelting and charging of electric furnace  (Read 166 times)
qizhen0926
Guest

Email

Smelting and charging of electric furnace
« on: Mar 13th, 2018, 4:47am »
Quote Quote Modify Modify Remove Remove

Requirements for loading: to shorten the time, to ensure the yield of the alloy elements, to reduce the power consumption and to increase the lining of the furnace
Before loading, the batching workers should be carefully proportioning according to the requirements of the planned furnace number and steel type. According to the requirements of different steel technology, the burden should be carefully analyzed and calculated and the ingredients are accurately proportioning. Therefore, it is necessary to confirm the composition and alloy composition of the iron and steel material needed before loading, and check the measuring instruments, so as to ensure the proper chemical composition and accurate weight after melting, so as to facilitate the smooth operation of smelting.CE Certification Vacuum Brazing Furnace Double Chambers Manufacture PYVAC
In order to achieve the density, it is necessary to rely on the reasonable collocation of large, medium and small furnace materials. The furnace material is dense, can be obtained once, and can improve the conduction and heat transfer performance of the furnace material. When the electrode is well, the arc is stable and is beneficial to melting. Usually, the charge is less than 10kg is called small material, 10~25kg material is more than 50kg, called aniseed. When loading, the furnace material of different capacity electric furnace has different size requirements, but the maximum of the furnace material must not exceed the 1/50 of the total burden of the furnace.
High Temperature Bottom Loading Elevator Furnace For Heating And Sintering
The cloth is more important, generally is part of small material miscellaneous iron installed in the basket bottom, above the small material, the center part of the charging basket loaded aniseed or refractory material, intermediate small fill material, so smooth and non porous, so that is conducive to conductive, and electrode broken bridge and eliminate material to prevent the collapse of material. The rest of the small and medium-sized material installed in refractory material or aniseed on and around. At the end of the material, the heavy load of 0.02%~0.03% was loaded on the upper part of the basket to help the arc, stabilize the current and reduce the radiation damage to the cover of the furnace.Multiple arc ion coating mchine
 
 
 
IP Logged
Back to top
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print

Previous topic | New Topic | Next topic »

Metropolis Reality Forums » Powered by YaBB 1 Gold - SP 1.3.1!
YaBB © 2000-2003. All Rights Reserved.